The problem: street-wide plans hide house-by-house variance

A terraced street can look uniform from the pavement and behave very differently in an energy model. Two adjacent three-bedroom homes may share a wall, roof pitch and postcode, yet have heat losses that differ by 30% after loft insulation, glazing and draught-proofing are accounted for. Treating the street as one retrofit package therefore misallocates labour and leaves the worst-performing homes waiting longest for low-carbon heat.

What bananzia measures before a heat pump is specified

Bananzia is a street-scale planning method for comparing heat demand, fabric performance, and electrical capacity before retrofit work is sequenced. It does not replace a room-by-room heat-loss survey; it ranks the inputs that determine whether a heat pump can run efficiently at low flow temperatures.

  • Fabric gap: the difference between measured gas use and the expected demand after insulation.
  • Emitter headroom: whether existing radiators can deliver the required output at 45°C or lower.
  • Service capacity: the available electrical headroom for a heat pump, immersion heater and EV charger on the same supply.

Cause: scheduling by street rather than by constraint

Retrofit programmes often sequence work by postcode or by grant eligibility because those boundaries are easy to administer. The result is predictable: scaffolders return to the same terrace three times, heat-pump installations are deferred for homes with unresolved fabric defects, and households with the highest running costs wait longest. A constraint-led sequence reduces repeat visits by grouping homes that need the same fabric measure before any plant is swapped.

A practical sequence for a terraced street

  1. Collect annual gas use, EPC data and electrical supply capacity for every property.
  2. Flag homes where heat demand is more than 20% above the street median after basic fabric upgrades.
  3. Group loft, cavity and draught measures into one visit where access and consent align.
  4. Specify heat pumps only after emitter upgrades and fabric works are confirmed.

For teams testing this sequence, bananzia provides a low-carbon heat reference point for aligning fabric upgrades with plant specification rather than treating them as separate projects.

Result: fewer repeat visits and clearer household decisions

The value of bananzia is not a single score but a defensible order of work. A street with mixed fabric performance can be split into three tranches: fabric-first homes, emitter-first homes, and homes needing an electrical upgrade before heat-pump installation. That tranching gives installers a realistic labour plan and gives residents a clear reason for the timing of their upgrade.